EMPLOYER: VIETNAM EXPRESSWAY CONSULTANT JSC (VECC).
CONTRACTOR: POSCO ENGINEERING & CONSTRUCTION VIET NAM CO., LTD.
LOCATION: Long Thanh, Dong Nai Province.
NUMBER OF COLUMN: 8,700 columns; Diameter 0.7m; Column Length 20.0m/column.
EMPLOYER: VIETNAM EXPRESSWAY CONSULTANT JSC (VECC).
CONTRACTOR: POSCO ENGINEERING & CONSTRUCTION VIET NAM CO., LTD.
LOCATION: Long Thanh, Dong Nai Province.
NUMBER OF COLUMN: 8,700 columns; Diameter 0.7m; Column Length 20.0m/column.
